Notified commencement · 2015-05-15
Replacement of black felt roof with zinc effect trocal. Removal of existing timber cladding to dormer with selected plaster finish. Installation of 4 No. roof lights on the south side of pitch roof and 2 No. roof lights on the flat roof dormer section. Blocking up of 3 No. existing windows on the south elevation. Removal of front porch sliding doors, (thus to returning porch to its original construction). Widening of the driveway and alterations to parking.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.