Notified commencement · 2017-09-01
The demolition and complete re-build of the existing roof to increase the pitch, ridge and eaves height, recess the existing front door to create a proposed new roofed veranda front porch; with the addition of two gable extensions walls to the front elevation with fenestration, 1no. dormer window to front elevation, conversion of an existing side garage to habitable space; construction of a new single storey extension to side and rear with roof-lights; and 3no. dormer windows to rear, alterations to all elevations and all associated site works to facilitate the development at 15 College Park, Castle knock Co. Dublin.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.