Protected structure, 2, Fitzwilliam Square East, Dublin 2 - Planning Application 5011/26

Dublin City Council · 501126 · Dublin

Latest linked evidence

Notified commencement · 2026-08-25

PROTECTED STRUCTURE: Ronnoco Jump ULC intends to apply for permission for development at No. 2 Fitzwilliam Square, Dublin 2 (a protected structure) consisting of: New kitchen layout arrangement in the basement. Re-pointing, including raking out the existing pointing and repointing the brickwork in a wigged joint to the front facade. Reinstatement of historic sash windows with slimline double glazing to replace non-original sashes, along with all associated ancillary works to the foregoing.

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    501126

  2. Planning decision

    501126

    Permission granted

  3. Grant date recorded

    501126

  4. Notified commencement

    Commencement notice

    PROTECTED STRUCTURE: Ronnoco Jump ULC intends to apply for permission for development at No. 2 Fitzwilliam Square, Dublin 2 (a protected structure) consisting of: New kitchen layout arrangement in the basement. Re-pointing, including raking out the existing pointing and repointing the brickwork in a wigged joint to the front facade. Reinstatement of historic sash windows with slimline double glazing to replace non-original sashes, along with all associated ancillary works to the foregoing.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.