Latest linked evidence
Notified commencement · 2022-08-15
1) the demolition of the existing 1-storey conservatory to the side,a chimney and boiler-shed to the rear of the dwelling; 2) The construction of a 1-storey extension to the side of the dwelling with a glazed, high level clerestorey and stepped flat roof; 3) All associated internal alterations and the alteration of the existing fenestration to the side and rear of the dwelling; 4) A stepped parapet to the extant 1-storey flat roof to the front of the dwelling; 5) The widening of the existing vehicular entrance at the front of the dwelling and a proposed pedestrian gate on the side boundary; 6) All associated drainage and site works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.