Notified commencement · 2024-02-01
The project consists of a 7-storey over basement self-storage facility with a small office space at ground floor at Liffey Valley Office Campus, Co Dublin. The building is to be located on a sloped site and as such the basement is accessible from grade level on the north elevation. The floor area reduces as the building height increases, where ground and first floor are larger than the second and third, which in turn are larger than the fourth, fifth and sixth. The building shall also consist of a separate small future development unit at ground floor which shall be completed to a shell and core finish for letting out to the market. The use of this unit has yet to be determined and a separate Fire Safety Certificate application may be required, subject to the future use.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.