Connected planning records

Planning case WEB580725

Dublin City Council · WEB580725 · Dublin 5, Dublin

Latest linked evidence

Notified commencement · 2026-06-04

(i) the retrofit, upgrade and extension of the existing two-storey detached dwelling, including refurbishment and internal reconfiguration; (ii) demolition of the existing single pitched-roof extension to the rear of the dwelling; (iii) partial demolition of sections of the existing dwelling, including removal of portions of external and internal walls, floors, and roof structures as necessary to facilitate the proposed works; (iv) construction of part single-storey and part two-storey extensions to the side and rear of the existing dwelling, together with a new porch to the front; (v) raising of the main roof height to accommodate an attic conversion; (vi) construction of two two-storey bay windows to the front elevation; (vii) alterations to all elevations including revised fenestration, external insulation, and new wall and roof finishes; (viii) installation of rooflights; (ix) provision of new sustainable drainage measures, including a subsurface soakaway, permeable paving, and associated surface water attenuation infrastructure; and (x) all ancillary site works including landscaping, boundary treatments, and associated works necessary to facilitate the development.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    WEB580725

  2. Planning decision

    WEB580725

    Permission granted

  3. Notified commencement

    Commencement notice

    (i) the retrofit, upgrade and extension of the existing two-storey detached dwelling, including refurbishment and internal reconfiguration; (ii) demolition of the existing single pitched-roof extension to the rear of the dwelling; (iii) partial demolition of sections of the existing dwelling, including removal of portions of external and internal walls, floors, and roof structures as necessary to facilitate the proposed works; (iv) construction of part single-storey and part two-storey extensions to the side and rear of the existing dwelling, together with a new porch to the front; (v) raising of the main roof height to accommodate an attic conversion; (vi) construction of two two-storey bay windows to the front elevation; (vii) alterations to all elevations including revised fenestration, external insulation, and new wall and roof finishes; (viii) installation of rooflights; (ix) provision of new sustainable drainage measures, including a subsurface soakaway, permeable paving, and associated surface water attenuation infrastructure; and (x) all ancillary site works including landscaping, boundary treatments, and associated works necessary to facilitate the development.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.