Connected planning records

Planning case D14A0482

Dun Laoghaire Rathdown County Council · D14A0482 · Mount Merrion, Co. Dublin, Dublin

Latest linked evidence

Notified commencement · 2015-05-05

(a) construction of two storey extension to the side, with bay/bay window extending to the front, construction of part single part two storey extension to the rear, and, conversion of existing attic (total area = 155.6 m.sq.), (b) minor alterations to the existing front elevation including altered window ope at first floor and altered front door ope at ground floor (with canopy roof over), (c) provision of roof window to the main roof to the front, and, (d) widening of existing vehicular entrance.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D14A0482

  2. Planning decision

    D14A0482

    Permission granted

  3. Grant date recorded

    D14A0482

  4. Notified commencement

    Commencement notice

    (a) construction of two storey extension to the side, with bay/bay window extending to the front, construction of part single part two storey extension to the rear, and, conversion of existing attic (total area = 155.6 m.sq.), (b) minor alterations to the existing front elevation including altered window ope at first floor and altered front door ope at ground floor (with canopy roof over), (c) provision of roof window to the main roof to the front, and, (d) widening of existing vehicular entrance.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.