Planning case 2460385

Laois County Council · 2460385 · Portlaoise, Laois

Latest linked evidence

Notified commencement · 2024-11-04

Greenfield Global, a chemical manufacturer with production facilities in Portlaoise, is planning to build a steel frame canopy with 181.06 m² over the loading area where an existing concrete yard is used to park ISO tanks, offering shelter to the people operating the same. There is a concern with the well-being of the truck drivers and operators of the loading instrumentation regarding winds, sun and rain and they have decided to build a canopy over this loading area to protect people and machinery from adverse weather conditions.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2460385

  2. Planning decision

    2460385

    Conditional permission

  3. Grant date recorded

    2460385

  4. Notified commencement

    Commencement notice

    Greenfield Global, a chemical manufacturer with production facilities in Portlaoise, is planning to build a steel frame canopy with 181.06 m² over the loading area where an existing concrete yard is used to park ISO tanks, offering shelter to the people operating the same. There is a concern with the well-being of the truck drivers and operators of the loading instrumentation regarding winds, sun and rain and they have decided to build a canopy over this loading area to protect people and machinery from adverse weather conditions.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.