Connected planning records

Planning case D18A0007

Dun Laoghaire Rathdown County Council · D18A0007 · Mount Merrion, Dublin

Latest linked evidence

Notified commencement · 2018-05-18

The proposed works are to include; (A) Alterations and extension of the existing flat roofed, two storey side extension, including replacing the flat roof with a pitched, hipped roof; (B) Formation, at attic level, of a rear dormer; (C) Extension of the first floor area into the front balcony area; (D) Construction of a single storey rear extension at ground floor level; (E) The fitting of two roof lights in the existing front roof slope and one roof light in the proposed side roof slope; (F) Contingent alterations to the main façade including erection of an entrance canopy; (G) The widening of the existing vehicular entrance and the fitting of gates and (H) Ancillary contingent works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D18A0007

  2. Planning decision

    D18A0007

    Permission granted

  3. Grant date recorded

    D18A0007

  4. Notified commencement

    Commencement notice

    The proposed works are to include; (A) Alterations and extension of the existing flat roofed, two storey side extension, including replacing the flat roof with a pitched, hipped roof; (B) Formation, at attic level, of a rear dormer; (C) Extension of the first floor area into the front balcony area; (D) Construction of a single storey rear extension at ground floor level; (E) The fitting of two roof lights in the existing front roof slope and one roof light in the proposed side roof slope; (F) Contingent alterations to the main façade including erection of an entrance canopy; (G) The widening of the existing vehicular entrance and the fitting of gates and (H) Ancillary contingent works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.