Notified commencement · 2026-01-30
Refurbishment of existing split-level detached dwelling, to include the following: 1. Partial demolition of some of existing walls, and re-configuration of same, 2. Removal of existing hipped roof and replacement with contemporary flat roof structures, 3. Construction of 3 no. extensions to dwelling, 4. Significant fenestration changes to entire building, 5. Change of layout of building, 6. Upgrading of existing wastewater system, and all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.