Latest linked evidence
Notified commencement · 2019-07-15
Renovation of existing ground floor level (from 94sq to 85.3 sq mtrs) to include change of windows, removal of log cabin at rear and extension to front (southwest) containing living room. Proposed first floor extension will consist of (82.3 sq mtr) containing 3 no. bedrooms and bathroom. Permission is also sought to decommission the existing septic tank and percolation area and permission to install a waste water treatment system and associated polishing filter and all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.