Latest linked evidence
Notified commencement · 2018-03-12
(a) Demolition of single storey attached garage to side (south-west), (b) demolition of single storey utility returns to side (south-west) and rear, (c) demolition of first floor dormer to front, (d) demolition of one chimney stack, (e) construction of single storey porch enclosure extension to front, (f) construction of two storey pitched roof extension to side (south-west), (g) construction of single storey flat roof extension to rear, (h) construction of replacement mono-pitched roof dormer extension to front, (i) construction of flat roof dormer extension to rear, (j) replacement of existing roof with new roof to same pitch, eaves and ridge height, (k) alterations to window opes to front elevation comprising blocking up one window and widening one window, (l) new window to side (north-east) elevation at ground floor level, (m) internal alterations and remodelling throughout, (n) new on-site waste water treatment system and polishing filter and (o) all ancillary site works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.