Planning case F13A0253

Fingal County Council · F13A0253 · Rush, Dublin

Latest linked evidence

Notified commencement · 2015-03-27

WORKS TO BE INCLUDED WITHIN PHASE ONE: Notices lodged 18/02/2014 Permission for works to Protected Structure and within the curtilage of Protected Structures Lambay Island, Rush, Co. Dublin. Lambay Island or parts thereof form part of, or are adjacent to, a Natura 2000 site, a Special Area of Conservation, a Special Protection Area, a proposed Marine Special Area of Conservation and a proposed Natural Heritage Area. PHASE ONE of The development will consist of: 1. Alterations to the Castle, a National Monument, and to the linked Guest Wing including installation of upgraded central heating, plumbing and electrical systems; in the Castle, conversion of a sluice room to a shower room, construction of a new underground toilet extension (net addition 2.6m2); minor modifications to fixtures and fittings in two bedrooms and in a toilet; in the Guest Wing, conversion of two bedrooms to bathrooms, works to fixtures and fittings in the kitchen, and scullery. Installation of limited plant equipment within existing barn and livestock accommodation within the Farmyard complex to accommodate an energy centre / plant room. 9. Works to the services and utilities infrastructure on the island comprising within this phase construction of photovoltaic panel arrays in the ilex field immediately to the east of the proposed farmyard energy / plant centre. Installation of limited underground heating and service connections linking the proposed energy centre with the Castle / Guest Wing. All the abo

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    F13A0253

    Official source

  2. Planning decision

    F13A0253

    Permission granted

    Official source

  3. Grant date recorded

    F13A0253

    Official source

  4. Notified commencement

    Commencement notice

    WORKS TO BE INCLUDED WITHIN PHASE ONE: Notices lodged 18/02/2014 Permission for works to Protected Structure and within the curtilage of Protected Structures Lambay Island, Rush, Co. Dublin. Lambay Island or parts thereof form part of, or are adjacent to, a Natura 2000 site, a Special Area of Conservation, a Special Protection Area, a proposed Marine Special Area of Conservation and a proposed Natural Heritage Area. PHASE ONE of The development will consist of: 1. Alterations to the Castle, a National Monument, and to the linked Guest Wing including installation of upgraded central heating, plumbing and electrical systems; in the Castle, conversion of a sluice room to a shower room, construction of a new underground toilet extension (net addition 2.6m2); minor modifications to fixtures and fittings in two bedrooms and in a toilet; in the Guest Wing, conversion of two bedrooms to bathrooms, works to fixtures and fittings in the kitchen, and scullery. Installation of limited plant equipment within existing barn and livestock accommodation within the Farmyard complex to accommodate an energy centre / plant room. 9. Works to the services and utilities infrastructure on the island comprising within this phase construction of photovoltaic panel arrays in the ilex field immediately to the east of the proposed farmyard energy / plant centre. Installation of limited underground heating and service connections linking the proposed energy centre with the Castle / Guest Wing. All the abo

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.