Notified commencement · 2025-08-14
The proposed works involve the change of use of an existing light engineering and electronic assembly facility into logistical distribution and storage facility, and alteration of existing office space. This consists of storage (normal hazard) area, truck driver resting and dining area, office reception area, visual room, tearoom, canteen, locker room, office units, protected lobbies/corridors, protected staircase, and toilet rooms, as indicated on the drawings
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.