Planning case 2150381

Donegal County Council · 2150381 · Buncrana, Donegal

Latest linked evidence

Notified commencement · 2022-06-30

CN0092087DL · RETENTION PERMISSION for (1) ENTRY PORCH CONSTRUCTED OVER THE EXISTING ACCESS RAMP (2) 2NO. EXTERNAL SIGNS (C) SERVICE HATCH ALL LOCATED ON THE SOUTH EAST FACING ELEVATION AND PERMISSION FOR (1) REMOVAL OF THE EXISTING CONCRETE RAMP ACCESSING THE BEACH (2) CONSTRUCTION OF A TIERED BALCONY AREA WITH 2.1M HIGH PERIMETER GLAZED WIND BREAKER, RETRACTABLE AWNINGS, ACCESS FROM THE EXISTING BUILDING AND STEPPED ACCESS FROM THE FOOTPATH (3) CONSTRUCTION OF NEW STEPPED AND RAMPED ACCESS TO THE BEACH

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2150381

  2. Planning decision

    2150381

    Conditional permission

  3. Grant date recorded

    2150381

  4. Notified commencement

    CN0092087DL

    RETENTION PERMISSION for (1) ENTRY PORCH CONSTRUCTED OVER THE EXISTING ACCESS RAMP (2) 2NO. EXTERNAL SIGNS (C) SERVICE HATCH ALL LOCATED ON THE SOUTH EAST FACING ELEVATION AND PERMISSION FOR (1) REMOVAL OF THE EXISTING CONCRETE RAMP ACCESSING THE BEACH (2) CONSTRUCTION OF A TIERED BALCONY AREA WITH 2.1M HIGH PERIMETER GLAZED WIND BREAKER, RETRACTABLE AWNINGS, ACCESS FROM THE EXISTING BUILDING AND STEPPED ACCESS FROM THE FOOTPATH (3) CONSTRUCTION OF NEW STEPPED AND RAMPED ACCESS TO THE BEACH

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.