Latest linked evidence
Notified commencement · 2018-05-01
Removal of boiler shed and store to rear. (2) construction of a new single storey, part pitched/part flat roof extension to the rear consisting of a kitchen, lounge, dining area. The rear extension is to incorporate a select stove with chimney and flue stack. (3) a new first floor side extension to consist of a bedroom and bathroom with tiled, hipped roof over to match existing dwelling (roof to incorporate 3 roof lights). (4) conversion of attic space for use as a play room/store room and incorporate flat roof dormer window to the rear. (5) general remodel of ground and first floors to suit the proposed new layouts. All drainage, structural and associated site works to be implemented.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.