Planning case 19192

Kildare County Council · 19192 · The Curragh, Kildare

Latest linked evidence

Notified commencement · 2020-05-29

The construction of a new temporary single storey prefabricated Special Education Needs unit at of St Anne’s Special School, the Curragh, Co. Kildare. The new accommodation shall consist of a Sensory Room, Communal Room, Equipment Store, 6no. Classrooms, Art Room, Changing Room, Toilet Facilities, One to One Room, Quiet Room, Waiting Area, all other ancillary accommodation, a new single storey canopy between the new prefabricated building and the existing school, a temporary playground together with all associated siteworks and fittings. The works will also include the installation of a new temporary low level crash barrier adjacent to and outside of the existing timber post rail fence adjacent to the proposed prefabricated building. The works will also include the removal of the non-native leylandii trees on the school site located along both the south west and north west boundaries of the site in order to facilitate the installation of the proposed prefabricated building. It should be noted that there will be no increase in the school population (either students or staff) on foot of this application as the proposed accommodation is as a replacement for existing sub-standard prefabricated accommodation on site.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    19192

  2. Planning decision

    19192

    Conditional permission

  3. Grant date recorded

    19192

  4. Notified commencement

    Commencement notice

    The construction of a new temporary single storey prefabricated Special Education Needs unit at of St Anne’s Special School, the Curragh, Co. Kildare. The new accommodation shall consist of a Sensory Room, Communal Room, Equipment Store, 6no. Classrooms, Art Room, Changing Room, Toilet Facilities, One to One Room, Quiet Room, Waiting Area, all other ancillary accommodation, a new single storey canopy between the new prefabricated building and the existing school, a temporary playground together with all associated siteworks and fittings. The works will also include the installation of a new temporary low level crash barrier adjacent to and outside of the existing timber post rail fence adjacent to the proposed prefabricated building. The works will also include the removal of the non-native leylandii trees on the school site located along both the south west and north west boundaries of the site in order to facilitate the installation of the proposed prefabricated building. It should be noted that there will be no increase in the school population (either students or staff) on foot of this application as the proposed accommodation is as a replacement for existing sub-standard prefabricated accommodation on site.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.