Notified commencement · 2023-05-26

(a) Alterations to the North-East facade of an existing dwelling along with internal reconfiguration of bedroom accommodation, (b) a 53.5 sqm single storey extension to the North-East facade for use as an independent living unit, providing 1 No. bedroom, shower room ensuite facility, and combined kitchen/ dining/ living area, (c) all associated site works and landscaping and, (d) modifications to the existing foul and surface water drainage systems, (e) and the replacement septic tank and percolation area to EPA 2021.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    211459

  2. Planning decision

    211459

    Conditional permission

  3. Grant date recorded

    211459

  4. Notified commencement

    Commencement notice

    (a) Alterations to the North-East facade of an existing dwelling along with internal reconfiguration of bedroom accommodation, (b) a 53.5 sqm single storey extension to the North-East facade for use as an independent living unit, providing 1 No. bedroom, shower room ensuite facility, and combined kitchen/ dining/ living area, (c) all associated site works and landscaping and, (d) modifications to the existing foul and surface water drainage systems, (e) and the replacement septic tank and percolation area to EPA 2021.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.