Connected planning records

Infrastructure, Seamus Quirke Road, Rahoon Road, Galway - Planning Application 2660211

Galway City Council · 2660211 · Galway

Latest linked evidence

Planning decision · 2026-08-11

2660211 · Conditional permission

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

Council amendment decision 11 August 2026. No final grant or current appeal outcome is established. Earlier parent development and revised services are kept separate.

3 official documents inspected · Checked 2026-09-06 · Official file index

This is a services and layout amendment to the earlier healthcare permission

Healthcare amendment; council decision recorded, final grant unverified · Galway City 2660211; revisions to the earlier primary-care and Tusla/HSE scheme

What the evidence says
The 11 August 2026 decision concerns amendments to Galway City 22/322 and Commission 318194: a smaller basement, parking changes, relocated electrical rooms, basement ventilation louvres, landscaping and drainage. Condition 1 retains the parent permission’s expiry. This is not approval for a second primary-care development, and the notification expressly is not a final grant.

Why it may matter — interpretation
Healthcare design teams can isolate the changed services and access packages without recounting the parent development.

What is not established
Final grant, any appeal, commencement and completed works are unverified.

Inspect the evidence

Valley Healthcare: amendment decision and four conditions · p.1
amendments to the previously permitted development · Issued 2026-08-11 · Decision on 26/60211; parent 22/322 and Commission 318194 remain distinct; not a final grant · Checked 2026-09-06

amendments to the previously permitted development

EV spaces move to the surface, with ducting required for the other surface spaces

Healthcare amendment; council decision recorded, final grant unverified · Surface parking under the amendment; installed chargers and future ducting remain distinct

What the evidence says
The amended layout moves EV charging spaces from the basement to surface level while maintaining overall permitted parking. Condition 2 additionally requires all remaining surface parking spaces to have ducting for future electrical connection points, agreed before commencement. It does not state that every space already has a charger.

Why it may matter — interpretation
Electrical designers can reassess cable routes and future charging provision after the move out of the basement.

What is not established
Final charger count, power ratings, load management, agreed layout and installed provision are unverified.

Inspect the evidence

Valley Healthcare: amendment decision and four conditions · p.3
ducting for electrical connection points · Issued 2026-08-11 · Decision on 26/60211; parent 22/322 and Commission 318194 remain distinct; not a final grant · Checked 2026-09-06

ducting for electrical connection points

The ESB substation and LV room move out of the healthcare building

Healthcare amendment; council decision recorded, final grant unverified · Relocated electrical rooms within the same healthcare permission

What the evidence says
The decision describes relocation of the ESB substation and LV switchroom from within the Primary Care Centre to a standalone building east of the site. It also includes basement-ventilation louvres. The reviewed decision does not supply transformer ratings, switchgear specifications or ventilation duties.

Why it may matter — interpretation
M&E engineers can check the revised building interface, distribution routes and access requirements for the separate electrical building.

What is not established
Transformer capacity, equipment models, network agreement, cable sizes and detailed ventilation design are unverified.

Inspect the evidence

Valley Healthcare: amendment decision and four conditions · p.1
standalone ESB substation · Issued 2026-08-11 · Decision on 26/60211; parent 22/322 and Commission 318194 remain distinct; not a final grant · Checked 2026-09-06

standalone ESB substation

Blue roofs were removed because of roof plant and PV access needs

Healthcare amendment; council decision recorded, final grant unverified · June detailed-design revision to roof drainage on the two buildings

What the evidence says
The 8 June engineering letter says blue-roof systems on both buildings were omitted because they conflicted with plant, rooftop services and PV access and drainage requirements. It substitutes approximately 200 m² of extensive green roof on the Primary Care Centre and 274 m² on the Tusla/HSE building. These are separate building areas; no blue-roof capacity is retained by inference.

Why it may matter — interpretation
Drainage and M&E engineers can coordinate roof storage choices with plant servicing and PV access before relying on the earlier design.

What is not established
Final roof build-up, selected system, approved detailed drawings and installed areas are unverified.

Inspect the evidence

Valley Healthcare: engineering explanation of amended services · p.2
Blue Roof Removal · Issued 2026-06-08 · 251204-PUNCH-XX-XX-C1-XX-001; received 18 June 2026; design and compliance response · Checked 2026-09-06

Blue Roof Removal

The revised strategy specifies one 300 m³ tank and permeable surfaces

Healthcare amendment; council decision recorded, final grant unverified · Sitewide amended attenuation arrangement described by the design engineer

What the evidence says
With the green roofs incorporated, the June letter states a required attenuation-tank volume of 300 m³. The single tank is east of the Primary Care Centre, coordinated with the ambulance station and substation; stone drainage layers beneath SuDS devices also contribute to the wider strategy. The Tusla/HSE hardstanding uses permeable surfaces. These components are not added together as equivalent storage capacities.

Why it may matter — interpretation
Drainage designers and suppliers can compare the stated tank requirement with the revised roof and paving design.

What is not established
Final tank product, hydraulic acceptance, discharge control and verified constructed storage are unverified.

Inspect the evidence

Valley Healthcare: engineering explanation of amended services · p.2
300 m³ · Issued 2026-06-08 · 251204-PUNCH-XX-XX-C1-XX-001; received 18 June 2026; design and compliance response · Checked 2026-09-06

300 m³

Basement foul drainage gains 24-hour emergency storage

Healthcare amendment; council decision recorded, final grant unverified · Amended basement foul drainage, separate from surface-water attenuation

What the evidence says
The same engineering letter introduces a foul pumping station below the basement slab with 24-hour emergency storage provision. It does not provide pump duty, chamber volume, redundancy or control-panel specifications on the reviewed page.

Why it may matter — interpretation
Wastewater engineers can check emergency-storage and maintenance-access requirements before selecting pumps and controls.

What is not established
Pump model, duty, standby arrangement, calculated volume, controls and installed performance are unverified.

Inspect the evidence

Valley Healthcare: engineering explanation of amended services · p.2
24-hour emergency storage · Issued 2026-06-08 · 251204-PUNCH-XX-XX-C1-XX-001; received 18 June 2026; design and compliance response · Checked 2026-09-06

24-hour emergency storage

The submitted lighting model names three Disano fitting groups

Healthcare amendment; council decision recorded, final grant unverified · October 2025 model submitted with the June 2026 amendment

What the evidence says
The model dated 28 October 2025 and received 18 June 2026 lists 4 Disano 3460 Denia PRO 1 fittings at 18 W, 10 Disano 3462 Denia PRO 1 cycleway fittings at 18 W, and 25 Disano 3465 Denia PRO 1 large-area fittings at 25 W. All three groups are labelled 4000 K. These are modelled quantities in the submitted design, not an installed inventory or a newly verified lighting revision.

Why it may matter — interpretation
Lighting designers can compare the named optics, wattages and colour temperature against any later approved layout.

What is not established
Later lighting changes, installation, supplier appointment and on-site light levels are unverified.

Inspect the evidence

Valley Health Primary Care Centre: public-lighting calculation · p.3
Denia PRO 1 · Issued 2025-10-28 · DIALux xma100 model; received 18 June 2026; no later revision inferred · Checked 2026-09-06

Denia PRO 1

The council requires acoustic panels and installation certification

Healthcare amendment; council decision recorded, final grant unverified · Council-conditioned boundary treatment; detailed noise assessment not inspected in this increment

What the evidence says
Condition 3 requires acoustic panels on the indicated walls and boundaries before building occupation, with qualified-engineer supervision and a photographic installation report for council agreement. The condition does not identify a panel product, sound rating or supplier.

Why it may matter — interpretation
Acoustic and envelope specialists can identify the evidence needed to demonstrate that the boundary treatment was installed.

What is not established
Panel build-up, tested rating, detailed locations, final agreement and installation certification are unverified.

Inspect the evidence

Valley Healthcare: amendment decision and four conditions · p.3
acoustic panels · Issued 2026-08-11 · Decision on 26/60211; parent 22/322 and Commission 318194 remain distinct; not a final grant · Checked 2026-09-06

acoustic panels
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. 59 catalogue rows retained. Selected pages of three PDFs were visually inspected. The full noise assessment, stormwater-audit file and complete drawing set were not comprehensively reviewed. Proposals do not establish procurement or installed work.

Source history

Timeline

  1. Planning application received

    2660211

  2. Planning decision

    2660211

    Conditional permission

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.