Latest linked evidence
Notified commencement · 2016-11-02
CN0021879CC · The works consist of two 4 hose pumps under a canopy 9m x 11m, with two 40,000Lt tanks and a petrol interceptor under the canopy. The canopy is located on an open site of the order 19m x 39m. There is civil and drainage work required and a fuel containment system.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.