Latest linked evidence
Notified commencement · 2026-01-27
The development will consist of the change of use from multi occupancy dwelling to single family dwelling and construction work to include: a) Reinstatement of stairs between ground and lower ground floor levels; b) overhauling original timber windows and replacing non original windows with traditional sash windows; c) Repointing of brickwork to front elevation, repair of natural slate roof, soffits and eaves, replacement of rain water gutters and downpipes, localised repair to chimneys, damp proofing to basement; d) Create opening between main reception rooms at entrance level, create opening of single door from rear return to facilitate connection to garden; e) Create lower ground floor rear extension of 18m2; f) New side entrance at ground floor level and external store of 12m2; g) Removal of non-original partitions, fittings and fixtures & demolition of existing extension (12m2) & out buildings (102m2); h) Renewal of mechanical and electrical services and decoration; i) Including all necessary site works.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.