Latest linked evidence
Notified commencement · 2019-02-18
The development will consist of the demolition of 1no. non-original two storey extension (4 sqm) at side and rear and subsequent construction of a new two storey flat roofed glazed extension (4 sqm) in its place at side and rear, alterations to a non-original flat roof extension to the front and side, replacement of an asbestos containing pitched roof to the rear and side, removal of external water tanks and support structure, enlargement of two existing roof windows in roof to front portion of the house, two additional roof windows, replacement of non-original front door; modifications at ground floor level to include enlarged opening in rear wall to access new extension, modification of new door opening between proposed bedroom three and proposed en-suite, replacement of 1no. sash window with french doors to side, dropping of level in proposed Bedroom three to match the rest of the floor level, reversal of four internal doors, modified partitions and layout and new attic hatches; modifications at basement level to include enlarged opening from proposed Playroom to external terrace, replacement of door to rear passageway with new window, provision of openings to connect 2no. existing rooms and part of hallway into one new Playroom, modifications to internal walls and layout, dropping of floor level in proposed Guest Bedroom to match the rest of the floor level and dropping of floor level in new Playroom a further 300mm, modifications to window layouts to side and rear, new d
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.