Save to pipeline
Connected planning records

Planning case D23A0257

Dun Laoghaire Rathdown County Council · D23A0257 · Blackrock, Dublin

Latest linked evidence

Notified commencement · 2026-01-07

1) Demolition of the existing rear garden shed. 2) Construction of a two-storey flat roof rear extension to consist of a lounge at the ground floor and a bedroom at the first floor. 3) Construction of a single storey flat roof front extension to consist of a kitchen and a porch. 4) Construction of a rear facing dormer to the existing attic space to consist of a home office. 5) General remodel and upgrade of the existing dwelling to suit the proposed layouts including the installation of a solar panels to the front of the main roof.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D23A0257

  2. Planning decision

    D23A0257

    Permission granted

  3. Grant date recorded

    D23A0257

  4. Notified commencement

    Commencement notice

    1) Demolition of the existing rear garden shed. 2) Construction of a two-storey flat roof rear extension to consist of a lounge at the ground floor and a bedroom at the first floor. 3) Construction of a single storey flat roof front extension to consist of a kitchen and a porch. 4) Construction of a rear facing dormer to the existing attic space to consist of a home office. 5) General remodel and upgrade of the existing dwelling to suit the proposed layouts including the installation of a solar panels to the front of the main roof.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.