Latest linked evidence
Notified commencement · 2020-06-29
(A) Sub division of the site with a timber fence and the construction of a new detached one and half storey 2 bedroom dwelling. (B) Provision of 1no.new waste water treatment system and percolation area to meet current EPA standards for the new detached dwelling along with all associated site development works, drainage, driveway access and landscaping to accommodate new dwelling. (C) Provision of 1no.new waste water treatment system and percolation area to current EPA standards for the existing “Torfield” dwelling along with all associated site development works. (D) Provision of surface water soakaway to meet BRE Digest 365 standards for the new detached house. (E) Widening of existing entrance off public road. (F) Dismantling and removal of Prefabricated Shed 2 -77sqm and relocation of Prefabricated Shed 1-48sqm on the footprint of Shed 2.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.