Connected planning records

Planning case D16A0776

Dun Laoghaire Rathdown County Council · D16A0776 · Dundrum, Dublin

Latest linked evidence

Notified commencement · 2017-08-09

The demolition of the existing rear single storey extension and single storey flat roofed garage to the side of the existing dwelling and the construction of a new single storey rear extension, new single storey side extension with attic floor, replacement of the existing roof with new roof to include dormer and Velux windows to new attic floor, alterations to and refurbishment of the existing dwelling, new electrical and plumbing systems, new underground drainage system, new, ancillary site works and hard landscaping at 3 Balally Drive, Dundrum, Dublin 14.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D16A0776

  2. Planning decision

    D16A0776

    Permission granted

  3. Grant date recorded

    D16A0776

  4. Notified commencement

    Commencement notice

    The demolition of the existing rear single storey extension and single storey flat roofed garage to the side of the existing dwelling and the construction of a new single storey rear extension, new single storey side extension with attic floor, replacement of the existing roof with new roof to include dormer and Velux windows to new attic floor, alterations to and refurbishment of the existing dwelling, new electrical and plumbing systems, new underground drainage system, new, ancillary site works and hard landscaping at 3 Balally Drive, Dundrum, Dublin 14.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.