Planning case 22813

Wicklow County Council · 22813 · Greystones, Wicklow

Latest linked evidence

Notified commencement · 2022-10-31

Sin E, Burnaby Road, The Burnaby, Greystones, Co. Wicklow. Alteration and extension to the existing bungalow dwelling (An Architectural Conservation Area). The works include the raising of the existing roof ridge and eaves to accommodate a dormer first floor, a single storey extension to the rear, a single storey extension to the front, relocation of the front entrance to the side of the dwelling, wrapping the existing structure in insulation and finishing same with render, replacement of the existing windows and introduction of additional windows where required to suit revised internal layout

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    22813

  2. Planning decision

    22813

    Conditional permission

  3. Grant date recorded

    22813

  4. Notified commencement

    Commencement notice

    Sin E, Burnaby Road, The Burnaby, Greystones, Co. Wicklow. Alteration and extension to the existing bungalow dwelling (An Architectural Conservation Area). The works include the raising of the existing roof ridge and eaves to accommodate a dormer first floor, a single storey extension to the rear, a single storey extension to the front, relocation of the front entrance to the side of the dwelling, wrapping the existing structure in insulation and finishing same with render, replacement of the existing windows and introduction of additional windows where required to suit revised internal layout

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.