Reviewed build intelligence

What the documents establish

Government document review

Galway County 2660867 changes house types for units 2–18 from three storeys to two, with retention of works to date. The 20 July 2026 notice is a decision to grant, expressly not a final grant. ACP501879 remains pending.

2 official documents inspected · Checked 2026-09-05 · Official file index

The decision covers 17 revised house types, not 17 additional homes

Council decision under appeal · Seventeen existing permitted plots in Siúlóid Fhursa, Headford

What the evidence says
Condition 1 limits the change to units 2–18 and carries forward parent permission 19/1001, extended under 25/125, except for the received amendments. Condition 2 ties the permission expiry to the extension of duration.

Why it may matter — interpretation
Interpretation for designers and estimators: the applicable package is a house-type revision within a pre-existing development; old conditions still matter.

What is not established
The pending appeal prevents treating this notice as a final grant. Completion, all prior-condition compliance and remaining construction quantities are not established.

Inspect the evidence

Galway County Council decision and conditions · p.2
Inspected PDF page 2 · Issued 2026-07-20 · Notification of decision to grant; two conditions · Checked 2026-09-05

solely of change of house type to units no. 2 – 18 only

The Type A/B drawing names brick, render and dark-grey windows

Proposed in the inspected application · Type A/B elevations on drawing 3110 only; not every house type in the 17-plot amendment

What the evidence says
The planning drawing labels selected brick cladding, painted sand/cement render, double-glazed dark-grey windows, blue/black uPVC downpipes and opaque glass to all gable windows. Its title block gives a 26 May 2026 issue date.

Why it may matter — interpretation
Interpretation for façade and window trades: these are specific finishes to reconcile with the final approved elevation package.

What is not established
Brand, exact brick product, installed finish, quantities and procurement status are not proven. Types C/D/E/F and the appeal outcome need separate checks.

Inspect the evidence

House Type A/B layout drawings · p.1
Inspected PDF page 1 · Issued 2026-05-26 · Project 21157, drawing 3110, revision field blank; planning application; received 29 May 2026 · Checked 2026-09-05

DOUBLE GLAZED, DARK GREY WINDOW
Remaining document questions
  • The pending appeal prevents treating this notice as a final grant. Completion, all prior-condition compliance and remaining construction quantities are not established.
  • Brand, exact brick product, installed finish, quantities and procurement status are not proven. Types C/D/E/F and the appeal outcome need separate checks.

Council viewer contains 34 document entries, of which 29 expose public PDF links and five are marked restricted viewing. Four public documents downloaded; decision and Type A/B drawing visually inspected. Restricted entries were not accessed. Other house types and construction/compliance files not fully reviewed.

Source history

Timeline

  1. Planning application received

    2660867

  2. Planning decision

    2660867

    Conditional permission

  3. Planning appeal received

    501879

    Official source · View Commission case

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.