Connected planning records

Planning case 413024

Dublin City Council · 413024 · Dublin, Dublin

Latest linked evidence

Notified commencement · 2025-08-05

The Rotunda Hospital - Temporary Radiology Department, The application comprises the construction of a single storey building for a Temporary Radiology Department at the Rotunda Hospital campus at Parnell Square, Dublin 1. The temporary building will be located to the rear of the existing hospital building within and be connected via a new link corridor. The construction will be formed of a structural steel frame on an insulated structural concrete floor slab. The external walls will be formed of metal clad insulated sandwich panels.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    413024

  2. Planning decision

    413024

    Permission granted

  3. Grant date recorded

    413024

  4. Notified commencement

    Commencement notice

    The Rotunda Hospital - Temporary Radiology Department, The application comprises the construction of a single storey building for a Temporary Radiology Department at the Rotunda Hospital campus at Parnell Square, Dublin 1. The temporary building will be located to the rear of the existing hospital building within and be connected via a new link corridor. The construction will be formed of a structural steel frame on an insulated structural concrete floor slab. The external walls will be formed of metal clad insulated sandwich panels.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.