Latest linked evidence
Notified commencement · 2025-02-05
Removal of the existing main low pitch hipped roof and replacement with new dormer roof with extended gable walls to include salvaged roof tiles to front with roof lights and metal/membrane roof/dormer to rear. New dormer roof extension to contain master bedroom with ensuite and walk in dressing room and to be accessed by new stairs from first floor level. Existing utility shed to side to be removed and new utility room to be constructed and associated site works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.