Protected structure, 15, Palmerston Road (a protected structure), Rathmines... - Planning Application WEB6087/25

Dublin City Council · WEB608725 · Dublin

Latest linked evidence

Notified commencement · 2026-09-14

CN0147234DC · The development will consist of alterations to previously approved Grant of Permission (Reg. Ref. 4173/21) as follows: LOWER GROUND FLOOR: • Relocation of approved kitchen location from rear to front with associated services installations; • New opening in non-original blockwork partition to facilitate kitchen units and infill / relocation of existing door opening within adjacent pantry room; • Alterations to approved partitions / layout within utility / bathroom areas; • Alteration to approved position of External Storage (west) wall and rebuilding of the non-original walls and roof enclosing the entrance lobby all to the front / side; PIANO NOBILE (MAIN ENTRANCE) FLOOR: • Omission of approved w.c. / study and partitions within side extension; • Reinstatement of hall toilet and removal of modern stepped access into side extension and relocation to rear office space gallery; FIRST FLOOR: • Omission of approved family bathroom within side extension; • Omission of approved layout alterations to existing bathroom and omission of approved bedroom / lobby layout; • Omission of approved upper landing alterations to retain existing landing w.c.; • Removal of floor structure, steps and ceiling in bedroom within non-original side extension and reinstatement at higher level to eliminate stepped access; Related alterations to non-original window openings at first floor (front and rear) and joinery to suit new levels; To include all associated conservation works to joinery / plasterwork

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    WEB608725

  2. Planning decision

    WEB608725

    Permission granted

  3. Grant date recorded

    WEB608725

  4. Notified commencement

    CN0147234DC

    The development will consist of alterations to previously approved Grant of Permission (Reg. Ref. 4173/21) as follows: LOWER GROUND FLOOR: • Relocation of approved kitchen location from rear to front with associated services installations; • New opening in non-original blockwork partition to facilitate kitchen units and infill / relocation of existing door opening within adjacent pantry room; • Alterations to approved partitions / layout within utility / bathroom areas; • Alteration to approved position of External Storage (west) wall and rebuilding of the non-original walls and roof enclosing the entrance lobby all to the front / side; PIANO NOBILE (MAIN ENTRANCE) FLOOR: • Omission of approved w.c. / study and partitions within side extension; • Reinstatement of hall toilet and removal of modern stepped access into side extension and relocation to rear office space gallery; FIRST FLOOR: • Omission of approved family bathroom within side extension; • Omission of approved layout alterations to existing bathroom and omission of approved bedroom / lobby layout; • Omission of approved upper landing alterations to retain existing landing w.c.; • Removal of floor structure, steps and ceiling in bedroom within non-original side extension and reinstatement at higher level to eliminate stepped access; Related alterations to non-original window openings at first floor (front and rear) and joinery to suit new levels; To include all associated conservation works to joinery / plasterwork

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.