Notified commencement · 2020-12-18
Reconfiguration and part extension within an existing 5 storey office development over a basement car park. The works comprise part extensions at 2nd and 3rd floor level, extending the rear stairwell from 1st to 3rd floor level with a new AOV provided. There will be a CAT A fit-out to the part extensions including raised access floors and suspended ceilings with cavity barriers, lighting, ventilation, VRF system and life safety systems. The works to the existing structure comprises new universal access WC to all upper floors, enlarging of window opening and new fire rated glazing at lower ground floor level (North Elevation), replacement of glazing from lower ground to 3rd Floor level (South Elevation), replacement of glazing at lower ground floor level (East Elevation) and a new platform lift extending from lower to upper ground floor level along the front elevation. At basement level the works comprise new toilet block, locker room, drying room, lobby area, bin store, tank room and telecom Room.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.