Latest linked evidence
Notified commencement · 2014-12-04
Replacing existing septic tank with Biocycle Wastewater treatment system.Change of use to convert post office to habitable living room. Replace existing bedroom structure on on east elevation with modern structure. Reduce height of post office wall in line with front roof. Remove existing toilet & utility block. Extend roof line to enclose water tank. Convert attached stable to WC and utility room.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.