Save this project to account
Connected planning records

~86 dwellings, Site on lands in the Townland of Moneymore, Drogheda, County Louth - Planning Application 2460795

Louth County Council · 2460795 · Louth

Latest linked evidence

Notified commencement · 2025-06-23

CN0130198LH · The proposed development comprises 86no. residential units in a mix of houses and duplex units; comprising of 78no. 2 storey houses (45no. 3-bedroom and 33no. 4-bedroom houses) including 1no. dwelling with an option to accommodate a childcare facility at ground floor level; 8no. 2-bedroom duplex units and all associated and ancillary site development and infrastructural works, hard and soft landscaping and boundary treatment works, including public open space; public lighting; 168no. surface car parking spaces; 42no. bicycle parking spaces/stores for mid-terrace and duplex units; ESB Substation; bin stores; connection to foul drainage pumping station permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494; landscaping and configuration amendments to the road north of House Nos. 34-38 permitted under LCC Reg. Ref. 2360494; the proposed development is accessed from the combined vehicular, cyclist, and pedestrian access at Twenties Lane permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494. The site is also accessible for pedestrians, cyclists and vehicles from Ballymakenny Road via Ballymakenny Avenue permitted under LCC Reg. Ref. 22215 and road infrastructure permitted under LCC Reg. Ref. 2460391. The proposed development ties in with road, utilities and surface water attenuation permitted under LCC Reg. Ref. 2460391. An EIAR and NIS accompany this application.

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2460795

  2. Planning decision

    2460795

    Conditional permission

  3. Grant date recorded

    2460795

  4. Notified commencement

    CN0130198LH

    The proposed development comprises 86no. residential units in a mix of houses and duplex units; comprising of 78no. 2 storey houses (45no. 3-bedroom and 33no. 4-bedroom houses) including 1no. dwelling with an option to accommodate a childcare facility at ground floor level; 8no. 2-bedroom duplex units and all associated and ancillary site development and infrastructural works, hard and soft landscaping and boundary treatment works, including public open space; public lighting; 168no. surface car parking spaces; 42no. bicycle parking spaces/stores for mid-terrace and duplex units; ESB Substation; bin stores; connection to foul drainage pumping station permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494; landscaping and configuration amendments to the road north of House Nos. 34-38 permitted under LCC Reg. Ref. 2360494; the proposed development is accessed from the combined vehicular, cyclist, and pedestrian access at Twenties Lane permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494. The site is also accessible for pedestrians, cyclists and vehicles from Ballymakenny Road via Ballymakenny Avenue permitted under LCC Reg. Ref. 22215 and road infrastructure permitted under LCC Reg. Ref. 2460391. The proposed development ties in with road, utilities and surface water attenuation permitted under LCC Reg. Ref. 2460391. An EIAR and NIS accompany this application.

    82 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.