South Dublin County Council · SHD3ABP30534319 · Newcastle, Dublin
Latest linked evidence
Notified commencement · 2021-07-12
CN0078483SD · Phase 6 - The construction of 48 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.
Phase 1, involving the construction of 51 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works.
51 units stated for this notice or phase; not a project total.
Phase 2, involving the construction of 53 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of M
53 units stated for this notice or phase; not a project total.
Phase 3, involving the construction of 1 Block of 8 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 he
8 units stated for this notice or phase; not a project total.
Phase 3, involving the construction of 1 Block of 12 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 h
12 units stated for this notice or phase; not a project total.
Phase 3, involving the construction of 1 Block of 16 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 h
16 units stated for this notice or phase; not a project total.
Phase 4 - The construction of 65 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
65 units stated for this notice or phase; not a project total.
Phase 5 - The construction of 31 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
31 units stated for this notice or phase; not a project total.
Phase 5a - The construction of 7 two storey timber frame residential units, comprising of 2 terraced units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
Erection of one 3 storey multi unit block with terraces at first floor consisting of 8no 2 storey timber frame Duplex units over 8no ground floor masonry constructed apartments.
16 units stated for this notice or phase; not a project total.
Erection of one 3 storey multi unit block with terraces at first floor consisting of 6no 2 storey timber frame Duplex units over 6no ground floor masonry constructed apartments.
12 units stated for this notice or phase; not a project total.
Erection of one 3 storey multi unit block with terraces at first floor consisting of 4no 2 storey timber frame Duplex units over 4no ground floor masonry constructed apartments.
8 units stated for this notice or phase; not a project total.
Erection of a 5/3 storey traditional built stepped multi unit with balconies & terraces, comprising of 26 residential apartment units, 1 ground floor commercial unit and 24 Duplex/Apartment units and associated site works, surface car parking, including a new site entrance to the development. 1 Building
50 units stated for this notice or phase; not a project total.
Phase 6 - The construction of 48 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
48 units stated for this notice or phase; not a project total.
Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.
Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.