Latest linked evidence
Notified commencement · 2025-04-04
For the following: 1. Skylight to North Roof Slope. 2. To remove existing roof hip on the East Side and extend it with an A line gable wall type to include a window with frosted glazing. 3. To construct a dormer roof on the South Roof Slope and convert the attic for use as Study/ Playroom and Attic Storage.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.