Latest linked evidence
Notified commencement · 2024-09-16
The development will consist of; 1) The removal of the existing hip roof and the rear flat roof, 2) The construction of a new first floor over part of the ground floor to accommodate a bedroom, home study, and living space, 3) New flat roof over existing ground floor area to front of house to be a ‘green roof’, 4) A side extension at ground floor levels to accommodate a new porch and front door location, 5) A new canopy to the front elevation at ground floor level to prevent overheating, 6) The installation of a new waste water treatment system and percolation area, 7) Internal modifications and all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.