Planning case 2424

Tipperary County Council · 2424 · Nenagh, Tipperary

Latest linked evidence

Notified commencement · 2025-10-01

CN0134317TT · i) Change of use from offices to residential ii) Reconfiguration of internal rooms of both floors of the protected structure, iii) The replacing of the non original aluminimum windows with traditional timber sash windows, iv) the alteration and addition of window opes to the rear portion of the building v) Replace flat roof to the rear portion of the building vi) The removal of an existing 1970's toilet block within the courtyard of the existing building vii) Reinstatement of garden boundary wall and all associated site works to facilitate the works on and under the land.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2424

  2. Planning decision

    2424

    Conditional permission

  3. Grant date recorded

    2424

  4. Notified commencement

    CN0134317TT

    i) Change of use from offices to residential ii) Reconfiguration of internal rooms of both floors of the protected structure, iii) The replacing of the non original aluminimum windows with traditional timber sash windows, iv) the alteration and addition of window opes to the rear portion of the building v) Replace flat roof to the rear portion of the building vi) The removal of an existing 1970's toilet block within the courtyard of the existing building vii) Reinstatement of garden boundary wall and all associated site works to facilitate the works on and under the land.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.