Latest linked evidence
Notified commencement · 2022-03-28
(1) Remove the existing balustrade to the front elevation & enclose the existing balcony at the first floor level. (2) Fit a roof light in the front roof elevation. (3) install window to the side elevation at first floor level. (4) Install window in the side elevation at ground floor level, and all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.