Latest linked evidence
Notified commencement · 2015-10-21
A. Partial lowering of basement level by 600mm. B. New insulated concrete floor to entire basement level. C. Damp-proofing of walls throughout basement level, including new wall and ceiling plasterwork. D. Removal of existing non-original internal stud walls. E. Formation of new window opening to front elevation at lower ground floor level with new painted timber sliding sash window with profiles and sections to match existing windows. F. Replacement of non-original casement window to front at lower ground floor level with hardwood sliding sash window. G. Alterations to door ope beneath front granite steps and fitting new door with granite step to same. H. Replacement of existing non-original external timber doors at lower ground floor level. I. Removal of existing timber floor to existing balcony to rear at ground floor level and installation of laminated glass floor to balcony. J. Alteration to existing internal door opes at first floor level. K. Addition of Master en-suite to front at first floor level. L. Forming new structural ope to rear roof plane and construction of new dormer window with glazed balcony. M. Addition of bathroom at second floor level. N. Installation of 4 no. heritage roof lights to front roof plane and 1 no. heritage roof light to rear roof plane. O. Replacement of gutters, downpipes and soil and waste pipes to rear. P. Conservation repair works internally to wall and ceiling plasterwork, suspended timber floors, internal joinery and fireplaces. Q. Re
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.