Latest linked evidence
Notified commencement · 2019-10-25
Removal of the existing side entrance and the existing front entrance porch; construction of a rear extension at ground floor level; change of use of the existing garage to residential use; dropping of all the window cills at ground level on the front elevation; construction of a new circular window to proposed new en- suite at first floor level; alterations to vehicular entrance by increasing the width of the vehicular entrance and dished kerb; all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.