Connected planning records

Planning case D15A0653

Dun Laoghaire Rathdown County Council · D15A0653 · Foxrock, Dublin

Latest linked evidence

Notified commencement · 2017-06-02

Construction of a detached part single, part two storey dwelling to the side (154 sqm); boundary works including provision of a new vehicular entrance off Foxrock Park (3.5m in width) to serve the proposed dwelling, the widening of the vehicular entrance to the existing dwelling (3.0m in width), provision of a new pedestrian entrance to the rear of the existing dwelling (1.1m in width); provision of landscaping and provision of all other associated site excavation and site development works above and below ground.(Overall site of 0.0547 ha).

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D15A0653

  2. Planning decision

    D15A0653

    Permission granted

  3. Grant date recorded

    D15A0653

  4. Notified commencement

    Commencement notice

    Construction of a detached part single, part two storey dwelling to the side (154 sqm); boundary works including provision of a new vehicular entrance off Foxrock Park (3.5m in width) to serve the proposed dwelling, the widening of the vehicular entrance to the existing dwelling (3.0m in width), provision of a new pedestrian entrance to the rear of the existing dwelling (1.1m in width); provision of landscaping and provision of all other associated site excavation and site development works above and below ground.(Overall site of 0.0547 ha).

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.