Latest linked evidence
Notified commencement · 2024-12-16
Reconstruction works at existing house, including, reconstruction of external perimeter walls on the same footprint as original dwelling, with kitchen/dining extension to rear, with increase of overall height of dwelling to include 2 no. dormer bedrooms, bathroom, hot press and landing. With bellmouth entrance, front boundary walls, piers, upgrade existing treatment system and percolation area, with connection of surface water to proposed upgraded soak away, with connection to existing services and all associated site works at Lislackagh, Swinford, Co. Mayo.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.