Notified commencement · 2024-12-16

Reconstruction works at existing house, including, reconstruction of external perimeter walls on the same footprint as original dwelling, with kitchen/dining extension to rear, with increase of overall height of dwelling to include 2 no. dormer bedrooms, bathroom, hot press and landing. With bellmouth entrance, front boundary walls, piers, upgrade existing treatment system and percolation area, with connection of surface water to proposed upgraded soak away, with connection to existing services and all associated site works at Lislackagh, Swinford, Co. Mayo.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2460129

  2. Planning decision

    2460129

    Conditional permission

  3. Grant date recorded

    2460129

  4. Notified commencement

    Commencement notice

    Reconstruction works at existing house, including, reconstruction of external perimeter walls on the same footprint as original dwelling, with kitchen/dining extension to rear, with increase of overall height of dwelling to include 2 no. dormer bedrooms, bathroom, hot press and landing. With bellmouth entrance, front boundary walls, piers, upgrade existing treatment system and percolation area, with connection of surface water to proposed upgraded soak away, with connection to existing services and all associated site works at Lislackagh, Swinford, Co. Mayo.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.