Connected planning records

Planning case F21B0408

Fingal County Council · F21B0408 · Malahide, Dublin

Latest linked evidence

Notified commencement · 2022-04-25

The timber shed will be built beside the existing garage. It will consists of a concrete base, prefabricated walls, a flat roof and double-glazed windows. It will be subdivided internally into a study and a storage area, with access to each via two separate doors. The shed will be used for domestic purposes and it is being built beside the existing garage as it is more feasible for access and to fully utilise both spaces. It will be built to the highest specifications and surface rainwater will be drained using a combination of a soak pit and rain harvesting.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    F21B0408

    Official source

  2. Planning decision

    F21B0408

    Permission granted

    Official source

  3. Grant date recorded

    F21B0408

    Official source

  4. Notified commencement

    Commencement notice

    The timber shed will be built beside the existing garage. It will consists of a concrete base, prefabricated walls, a flat roof and double-glazed windows. It will be subdivided internally into a study and a storage area, with access to each via two separate doors. The shed will be used for domestic purposes and it is being built beside the existing garage as it is more feasible for access and to fully utilise both spaces. It will be built to the highest specifications and surface rainwater will be drained using a combination of a soak pit and rain harvesting.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.