Connected planning records

Planning case 403920

Dublin City Council · 403920 · Dublin, Dublin

Latest linked evidence

Notified commencement · 2026-08-04

1) Construction of two no. 3-bedroom mews dwellings of 146 sq.m and 147 sq.m respectively, consisting of two-storey onto Baggot Lane and 3 storey to the rear; 2) Provision of first floor level terrace to the rear and second floor level terrace to Baggot Lane; 3) enclosed garden to the rear of each mews; 4) Separation of the mews site area from the larger overall site to the rear of 46-48 Pembroke Road, resulting in the reduction of the existing car spaces

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    403920

  2. Planning decision

    403920

    Permission granted

  3. Grant date recorded

    403920

  4. Notified commencement

    Commencement notice

    Installation of the below ground surface water soakaway (drainage works)

    Quantity not established for this notice.

    · Notice evidence

  5. Notified commencement

    Commencement notice

    1) Construction of two no. 3-bedroom mews dwellings of 146 sq.m and 147 sq.m respectively, consisting of two-storey onto Baggot Lane and 3 storey to the rear; 2) Provision of first floor level terrace to the rear and second floor level terrace to Baggot Lane; 3) enclosed garden to the rear of each mews; 4) Separation of the mews site area from the larger overall site to the rear of 46-48 Pembroke Road, resulting in the reduction of the existing car spaces

    2 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.