Planning case 2660603

Limerick City and County Council · 2660603

Latest linked evidence

Planning decision · 2026-07-22

2660603 · Conditional permission

Open official source

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

W34 LRD appeal 324580 was lodged on 17 August 2026 for 403 apartments, a creche and medical centre under Limerick2660603. The May2026 EIAR identifies selected design systems, while the appeal remains pending.

1 official documents inspected · Checked 2026-09-05 · Official file index

Exhaust-air heat pumps and demand-controlled ventilation are in the design

Proposed in the inspected application · May2026 design for Parkway Valley residential units; no equipment quantity extrapolation

What the evidence says
The EIAR says the proposed design incorporates electrically driven exhaust-air heat pumps for residential heating and hot water, demand-controlled ventilation, LED lighting and smart lighting controls. It describes an A2 BER design target.

Why it may matter — interpretation
Interpretation for mechanical-services designers and installers: an explicit system family supports focused review of the dwelling services package.

What is not established
Final permission, brand/model, number of units served, equipment appointment, installed systems and achieved BER are not established. Check the eventual appeal order and coordinated services schedule.

Inspect the evidence

Parkway Valley EIAR VolumeII Part1 · p.60
Inspected PDF page 60 · Issued May 2026 (month only) · Application EIAR, stamped received28May2026 · Checked 2026-09-05

exhaust air heat pumps

Green roofs, permeable surfaces and an attenuation pond form the drainage design

Proposed in the inspected application · Proposed Parkway Valley surface-water system; modelled design standard

What the evidence says
The surface-water design combines sedum green roofs, rain gardens, permeable paving/porous asphalt, swales, infiltration trenches, tree pits and an open attenuation pond. It models the1-in-100-year storm with30% climate allowance and specifies0.5m pond freeboard.

Why it may matter — interpretation
Interpretation for civil, landscape and roofing trades: the report identifies connected drainage components whose interfaces matter to the detailed package.

What is not established
Final approved dimensions, product quantities, installed drainage and maintenance appointment are unknown. Read the engineering drawings and eventual conditions before treating this as a bill of quantities.

Inspect the evidence

Parkway Valley EIAR VolumeII Part1 · p.177
Inspected PDF page 177 · Issued May 2026 (month only) · Application EIAR, stamped received28May2026 · Checked 2026-09-05

0.5 m freeboard
Remaining document questions
  • Final permission, brand/model, number of units served, equipment appointment, installed systems and achieved BER are not established. Check the eventual appeal order and coordinated services schedule.
  • Final approved dimensions, product quantities, installed drainage and maintenance appointment are unknown. Read the engineering drawings and eventual conditions before treating this as a bill of quantities.

Eleven ACP PDF links discovered; NTS and two main-text parts downloaded. Selected technical pages of VolumeII Part1 visually inspected; other files are downloaded/not fully inspected or unassessed, not additional findings.

Source history

Timeline

  1. Planning application received

    2660603

    Official source

  2. Planning decision

    2660603

    Conditional permission

    Official source

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.