Planning case 211718

Kildare County Council · 211718 · Kildare

Latest linked evidence

Notified commencement · 2023-05-04

ALTERATIONS AND EXTENSION TO EXISTING SINGLE STOREY DWELLING. THE APPLICATION WILL INCLUDE THE FOLLOWING; (a) REMOVAL OF EXISTING CORRUGATED SHED BUILDING: (B) REFURBISHMENT OF THE EXISTING SINGLE STOREY COTTAGE TO PROVIDE 3 NO. BEDROOMS: (C) CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO PROVIDE NEW LIVINGROOM, BATHROOM, UTILITY ROOM AND KITCHENSPACE ALL TO THE REAR OF THE EXISTING COTTAGE: (D) ALTERATIONS TO THE EXISTING VEHICLE ENTRANCE TO PROVIDE A RECESSED VEHICLE ENTRANCE: (E) PROVISION OF NEW WASTEWATER TREATMENT SYSTEM ALONG WITH ALL ASSOICATED SITE WORKS

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    211718

  2. Planning decision

    211718

    Conditional permission

  3. Grant date recorded

    211718

  4. Notified commencement

    Commencement notice

    ALTERATIONS AND EXTENSION TO EXISTING SINGLE STOREY DWELLING. THE APPLICATION WILL INCLUDE THE FOLLOWING; (a) REMOVAL OF EXISTING CORRUGATED SHED BUILDING: (B) REFURBISHMENT OF THE EXISTING SINGLE STOREY COTTAGE TO PROVIDE 3 NO. BEDROOMS: (C) CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO PROVIDE NEW LIVINGROOM, BATHROOM, UTILITY ROOM AND KITCHENSPACE ALL TO THE REAR OF THE EXISTING COTTAGE: (D) ALTERATIONS TO THE EXISTING VEHICLE ENTRANCE TO PROVIDE A RECESSED VEHICLE ENTRANCE: (E) PROVISION OF NEW WASTEWATER TREATMENT SYSTEM ALONG WITH ALL ASSOICATED SITE WORKS

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.