Latest linked evidence
Notified commencement · 2025-09-08
CN0132847DC · These works are part of Planning Ref WEB2248/24 but are not part of works which require a FSC. The works are Repointing of stone work using lime pointing where required; removal of existing aluminium gutters and replacement with new cast iron gutters; at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary; repair and maintenance of East Gable Cross and base stone; repair and maintenance west gable cross and base stone; repair and maintenance of Bell Tower including insertion and grouting in of stainless-steel dowels; construction of 2 No. Low-level Metal Standing-seam Dormer Roofs to detail to the South Elevation Roof Eaves
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.