Notified commencement · 2019-05-13
CN0051778LL · Phase II of refurbishment which includes work to seal the roof, some further pointing to the exterior, finish the flooring inside and plaster work and painting inside. Install three phase electricity and new heaters and lights. Phase I consisted of change of use of existing St. Andrew's Church of Ireland (now disused), from former ecclesiastical to a small community performance building; the conservation and refurbishment of the original structure; the insertion of demountable timer partitions to create one no. meeting room, a kitchen, toilets in the rear side aisle, as well as the adaption of the former vestry to the rear for use as a back stage area and a small servery to the west end of the nave. Connect to the town sewer pipes and water mains located directly outside the main entrance gates.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.