Planning case 18171

Kilkenny County Council · 18171 · Kilkenny, Kilkenny

Latest linked evidence

Notified commencement · 2023-12-20

Construction of 8nr houses at Abbey Meadows, Ferrybank - No 3 to 5 The Drive, No 7 to 9 The Rise and, No No 1 and No 2 the Grange. Refer to keyplan for precise location. Existing bases to be removed and new foundations/ground floor to be constructed as part of works. Buildings to be masonry walls with metal web timber joists at first floor and prefabricated timber roof trusses. Ancillary site works to include access road, foul and storm water drainage connecting to existing network, mains water connection with fire hydrant to serve the development.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    18171

  2. Planning decision

    18171

    Conditional permission

  3. Grant date recorded

    18171

  4. Notified commencement

    Commencement notice

    The construction of 18 no. apartment terrace block (3 storey)comprimsing of comprising of 4 no. ground floor 1 bedroom units, 4 no. ground/first floor 2 bedroom units, 1 no. ground floor 2 bedroom unit, 5 no. first/second floor 2 bedroom units and 4 no. first/second floor 1 bedroom units.

    Quantity not established for this notice.

    · Notice evidence

  5. Notified commencement

    Commencement notice

    Construction of 6nr houses at The Grange, Abbey Meadows, Ferrybank - No 3 to No 8 inclusive. Refer to keyplan for precise location. Houses to be type 'C' and 'C2' as per the planning application denoted construction stage as type A - 4nr end of terrace and type 'C1' as per the planning application denoted at constructions stage as type B - 2nr mid terrace. Existing bases to be removed and new foundations/ground floor to be constructed as part of works. Buildings to typically be masonry walls with metal web timber joists at first floor and prefabricated timber roof trusses. Ancillary site works to include access road, foul and storm water drainage connecting to existing network, mains water connection with fire hydrant to serve the development.

    6 units stated for this notice or phase; not a project total.

    · Notice evidence

  6. Notified commencement

    Commencement notice

    Construction of 8nr houses at Abbey Meadows, Ferrybank - No 3 to 5 The Drive, No 7 to 9 The Rise and, No No 1 and No 2 the Grange. Refer to keyplan for precise location. Existing bases to be removed and new foundations/ground floor to be constructed as part of works. Buildings to be masonry walls with metal web timber joists at first floor and prefabricated timber roof trusses. Ancillary site works to include access road, foul and storm water drainage connecting to existing network, mains water connection with fire hydrant to serve the development.

    8 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.