Latest linked evidence
Notified commencement · 2022-06-17
The development will consist of demolition of existing sheds to rear, construction of a 20sqm single storey flat roof extension to the rear with a rooflight, a 5sqm single storey pitched roof extension to the rear, internal modifications to ground floor level including a provision for a new door for access to a pantry and utility room, blocking up one existing door, creation of new opes in the ground floor return for access to the new extensions and for new timber double glazed windows to rear, relocation of one fireplace within the ground floor, modifications on first floor to allow for provision of new internal door opes to create master suite, new timber stud wall in existing rear bedroom to create a family bathroom, two new timber double glazed windows in modified opes in rear bedroom, repair works to rendered facades as necessary, repair and reslating works to roof to include provision of one velux type roof light on inner slope for future roof access and maintenance, refurbishment of original timber windows to include slim double glazing, repairs and replacement as necessary to internal cornicing, skirtings and architraves, new painted cast iron railings to front entrance, construction of new timber sheds to garden, provision for a freestanding car charge point inside front boundary and associated site and drainage works, all at No. 2 Bayswater Terrace, The Harbour, Greystones, (Protected Structure), a two-storey terraced dwelling.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.